Mattiro Bombang SULAWESI SELATAN
+79%
Lero Pinrang SULAWESI SELATAN
+75%
Limbua SULAWESI BARAT
+70%
Punagaya SULAWESI SELATAN
+69%
Tadang Palie SULAWESI SELATAN
+69%
Tamarupa SULAWESI SELATAN
+67%
Terapung SULAWESI TENGGARA
+68%
Lumpue SULAWESI SELATAN
+66%
Bontorannu SULAWESI SELATAN
+65%
Watolo SULAWESI TENGGARA
+65%
Takkalasi SULAWESI SELATAN
+65%
Data SULAWESI SELATAN
+70%
Arungkeke Pallantikang SULAWESI SELATAN
+64%
Bungeng SULAWESI SELATAN
+63%
Lasama SULAWESI TENGGARA
+63%
RANKING PROVINSI
Provinsi Total Site Avg Completion Hub Penyangga
SULAWESI TENGGARA 15 52.33% 4 11
SULAWESI SELATAN 50 50.54% 7 43
SULAWESI BARAT 6 45.33% 0 6
SULAWESI TENGAH 14 44.50% 2 12
GORONTALO 11 36.09% 1 10
SULAWESI UTARA 15 0.53% 3 12
TOP 10 PROVINSI
ProvinsiAvg Completion
SULAWESI TENGGARA 52.33%
SULAWESI SELATAN 50.54%
SULAWESI BARAT 45.33%
SULAWESI TENGAH 44.50%
GORONTALO 36.09%
SULAWESI UTARA 0.53%
DISTRIBUSI PROGRESS NASIONAL
0%
11
1-25%
12
26-50%
42
51-75%
45
76-99%
1
100%
0
PROGRESS TERBARU
Bassiang Timur
SULAWESI SELATAN

34% Pekerjaan DPT
-Pekerjaan pemasangan bekesting DPT
2026-09-14 20:54:00
Mattiro Bombang
SULAWESI SELATAN

37% Pekerjaan Tambatan Perahu, Shelter Pendaratan Ikan dan Kios Perbekalan
* Fabrikasi Pembesian Floot Plate Tambatan Perahu * Pengecoran Kolom K2 Beton Bangunan Shelter Pendaratan Ikan * Pemasangan Batu Belah Aanstamping Revetment * Pembuatan Bekisting Kolom K2 Beton Bangunan Kios Perbekalan
2026-09-14 20:12:00
Bawalipu
SULAWESI SELATAN

5% Pekerjaan Pondasi
* Galian pondasi
2026-09-14 20:10:00
To'bia
SULAWESI SELATAN

19% Pekerjaan DPT
-Pekerjaan pembuatan bekesting DPT -Pekerjaan Fabrikasi Pembesian
2026-09-14 19:57:00
Muara Sampara
SULAWESI TENGGARA

18% Pekerjaan DPT
* Pek. Pembesian Dinding Penahan tanah ( DPT )
2026-09-14 19:48:00
Terapung
SULAWESI TENGGARA

25% Pekerjaan DPT dan Curing Beton
* Curing Beton * Bongkar bekisting footplate * Perakitan Pembesian DPT
2026-09-14 19:24:00
Binanga Karaeng
SULAWESI SELATAN

22% Pekerjaan DPT, Revertment dan Tambatan Perahu
* Pek. Pemasangan bekisting dinding penahan tanah * Pek. Pembesian dinding penahan tanah revetment * Pemasangan cerucuk dolken pada tambatan perahu * Fabrikasi Pembesian
2026-09-14 19:18:00
Lakawali Pantai
SULAWESI SELATAN

42% Pekerjaan Pembesian DPT
* Pek. Pembesian tapak DPT
2026-09-14 19:12:00
Padang Kalua
SULAWESI SELATAN

20% Pekerjaan Pondasi
•perakitan pembesian pondasi tapak
2026-09-14 19:06:00
Tirowali
SULAWESI SELATAN

29% Pekerjaan Shelter Pendaratan Ikan, Tangki Air, Gudang Beku dan Docking Perahu
-Pekerjaan pemasangan ringbalok di banguna shelter pendaratan ikan -Pekerjaan pabrikasi pembesian sloof di bangunan tangki air -Pekerjaan pengecoran lantai di bangunan gudang beku -Pekerjaan pemasangan wermes di bangunan docking perahu
2026-09-14 19:02:00
DETAIL SITE
Site Provinsi Status Completion Updated
SITE00060
Harapan
SULAWESI SELATAN PENYANGGA 55% 2026-11-24 09:42:01 Lihat Site
SITE00052
Polewali
SULAWESI TENGGARA HUB 55% 2026-11-25 10:01:29 Lihat Site
SITE00031
Tondasi
SULAWESI TENGGARA PENYANGGA 55% 2026-11-12 10:35:19 Lihat Site
SITE00079
Laemanta Utara
SULAWESI TENGAH PENYANGGA 55% 2026-11-18 10:18:44 Lihat Site
SITE00156
Rantebelu
SULAWESI SELATAN PENYANGGA 54% 2026-11-24 10:28:43 Lihat Site
SITE00044
Mabonta
SULAWESI SELATAN PENYANGGA 54% 2026-11-19 15:58:37 Lihat Site
SITE00126
Tolinggula Pantai
GORONTALO HUB 53% 2026-11-25 10:51:01 Lihat Site
SITE00123
Bulontiyo barat
GORONTALO PENYANGGA 53% 2026-11-25 10:49:44 Lihat Site
SITE00148
Tete B
SULAWESI TENGAH PENYANGGA 53% 2026-11-24 11:10:42 Lihat Site
SITE00143
Bangko
SULAWESI TENGGARA HUB 53% 2026-10-30 15:14:05 Lihat Site