DETAIL PROGRESS KNMP

100
Lokasi Progress Bergerak
41.55%
Progress Nasional
0.37%
Rata-rata per Site
0
Site Selesai 100%
TREND PROGRESS NASIONAL
TOP KENAIKAN PROGRESS
Mattiro Bombang SULAWESI SELATAN
+79%
Lero Pinrang SULAWESI SELATAN
+75%
Limbua SULAWESI BARAT
+70%
Tadang Palie SULAWESI SELATAN
+69%
Punagaya SULAWESI SELATAN
+69%
Terapung SULAWESI TENGGARA
+68%
Tamarupa SULAWESI SELATAN
+67%
Lumpue SULAWESI SELATAN
+66%
Bontorannu SULAWESI SELATAN
+65%
Data SULAWESI SELATAN
+70%
Arungkeke Pallantikang SULAWESI SELATAN
+64%
Watolo SULAWESI TENGGARA
+65%
Takkalasi SULAWESI SELATAN
+65%
Bungeng SULAWESI SELATAN
+63%
Lasama SULAWESI TENGGARA
+63%
RANKING PROVINSI
Provinsi Total Site Avg Completion Hub Penyangga
SULAWESI TENGGARA 15 52.33% 4 11
SULAWESI SELATAN 50 50.54% 7 43
SULAWESI BARAT 6 45.33% 0 6
SULAWESI TENGAH 14 44.50% 2 12
GORONTALO 11 36.09% 1 10
SULAWESI UTARA 15 0.53% 3 12
TOP 10 PROVINSI
ProvinsiAvg Completion
SULAWESI TENGGARA 52.33%
SULAWESI SELATAN 50.54%
SULAWESI BARAT 45.33%
SULAWESI TENGAH 44.50%
GORONTALO 36.09%
SULAWESI UTARA 0.53%
DISTRIBUSI PROGRESS NASIONAL
0%
11
1-25%
12
26-50%
42
51-75%
45
76-99%
1
100%
0
PROGRESS TERBARU
Tadang Palie
SULAWESI SELATAN

64% Pekerjaan Jalan Kawasan, Bangunan Genset, Tambatan Perahu dan Revetment
* Pek. Pengecoran plat duiker dan kanstin jalan kawasan * Pek. Tangga revetment * Pek. Pondasi batu kali bangunan genset * Pek. Pembesian besi plat lantai tambatan perahu * Pek. Pemasangan bekisting ringbalk atas dan balok anak tambatan perahu
2026-11-17 19:39:00
Tamarupa
SULAWESI SELATAN

63% Pekerjaan Revetment dan DPT
* Pembesian Revetment * Pemasangan Bekisting Revetment * Pembuatan Pondasi Penahan Timbunan * Fabrikasi Pembesian
2026-11-17 19:26:00
Muara Tinobu
SULAWESI TENGGARA

27% Pekerjaan Tambatan Perahu dan DPT
= pek. Tambatan perahu = pek. Dpt.
2026-11-17 19:24:00
Tanjung Bunga
SULAWESI TENGGARA

33% Pekerjaan Tambatan Perahu
= pek. Balok bawah tambatan perahu
2026-11-17 19:18:00
Lakara
SULAWESI TENGGARA

59% Pekerjaan Revetment dan Kios Perbekalan
= pek. Pemasangan mal tangga revetment = pek. Kios perbekalan
2026-11-17 19:05:00
Lampenai
SULAWESI SELATAN

38% Pekerjaan DPT
Pek. Pemasangan mal DPT
2026-11-17 19:03:00
Bawalipu
SULAWESI SELATAN

30% Pekerjaan Gudang Es, Rumah Genset dan Pabrik Es Portable
* Urugan pasir gudang es beku * Pengecoran slof rumah genset * Pengecoran lantai pabrik es portable
2026-11-17 19:00:00
Waetuoe
SULAWESI SELATAN

49% Pekerjaan Saluran, Shelter Pendaratan Ikan dan Kios Perbekalan
* Pek. Pemasangan batu bela saluran drainase * Pek. Pemasangan lisplang bangunan shelter pendaratan ikan * Pek. Plesteran dinding kuda" beton bangunan kios perbekalan * Pek. Pengecoran tangga revetment
2026-11-17 18:33:00
Limbua
SULAWESI BARAT

66% PEK SHELTER PENDARATAN IKAN

2026-11-17 13:12:00
Tete B
SULAWESI TENGAH

46% PEK DPT

2026-11-17 12:25:00
DETAIL SITE
Site Provinsi Status Completion Updated
SITE00158
Tasiwalie
SULAWESI SELATAN PENYANGGA 38% 2026-11-25 12:01:45 Lihat Site
SITE00028
To'bia
SULAWESI SELATAN PENYANGGA 38% 2026-11-17 11:35:51 Lihat Site
SITE00064
Lampenai
SULAWESI SELATAN PENYANGGA 38% 2026-11-19 15:59:34 Lihat Site
SITE00150
Siddo
SULAWESI SELATAN PENYANGGA 37% 2026-11-19 10:00:06 Lihat Site
SITE00036
Cimpu Utara
SULAWESI SELATAN PENYANGGA 37% 2026-11-16 09:44:31 Lihat Site
SITE00011
Tubo Poang
SULAWESI BARAT PENYANGGA 35% 2026-11-24 10:44:13 Lihat Site
SITE00076
Boyantongo
SULAWESI TENGAH HUB 35% 2026-11-25 09:40:53 Lihat Site
SITE00008
Bonde Utara
SULAWESI BARAT PENYANGGA 34% 2026-11-19 09:35:50 Lihat Site
SITE00020
Songka
SULAWESI SELATAN PENYANGGA 33% 2026-11-24 09:55:51 Lihat Site
SITE00140
Tanjung Bunga
SULAWESI TENGGARA PENYANGGA 33% 2026-11-25 10:06:03 Lihat Site