DETAIL PROGRESS KNMP

90
Lokasi Progress Bergerak
18.11%
Progress Nasional
0.19%
Rata-rata per Site
0
Site Selesai 100%
TREND PROGRESS NASIONAL
TOP KENAIKAN PROGRESS
Takkalasi SULAWESI SELATAN
+50%
Mattiro Bombang SULAWESI SELATAN
+46%
Tamarupa SULAWESI SELATAN
+44%
Pajjukukang SULAWESI SELATAN
+43%
Borimasunggu SULAWESI SELATAN
+42%
Lasama SULAWESI TENGGARA
+39%
Bassiang Timur SULAWESI SELATAN
+39%
Latawe SULAWESI TENGGARA
+38%
Lero Pinrang SULAWESI SELATAN
+36%
Bone Pute SULAWESI SELATAN
+36%
Tadang Palie SULAWESI SELATAN
+33%
Karang-karangan SULAWESI SELATAN
+32%
Lakara SULAWESI TENGGARA
+32%
Tanjung Laimeo SULAWESI TENGGARA
+31%
Tondasi SULAWESI TENGGARA
+31%
RANKING PROVINSI
Provinsi Total Site Avg Completion Hub Penyangga
SULAWESI TENGGARA 15 23.73% 4 11
SULAWESI SELATAN 50 20.26% 7 43
SULAWESI BARAT 6 15.83% 0 6
SULAWESI TENGAH 14 15.36% 2 12
GORONTALO 11 5.45% 1 10
TOP 10 PROVINSI
ProvinsiAvg Completion
SULAWESI TENGGARA 23.73%
SULAWESI SELATAN 20.26%
SULAWESI BARAT 15.83%
SULAWESI TENGAH 15.36%
GORONTALO 5.45%
DISTRIBUSI PROGRESS NASIONAL
0%
11
1-25%
58
26-50%
27
51-75%
0
76-99%
0
100%
0
PROGRESS TERBARU
Tadang Palie
SULAWESI SELATAN

21% Pekerjaan DPT dan Saluran
* Pek. Perakitan besi * Pek. Pemasangan Batu Bela Saluran * Pengecoran Dpt, Pamasangan Bekisting Dpt dan Penimbunan Tanah Lokasi * Pek. Tambatan Perahu * Fabrikasi Pembesian
2026-08-20 19:20:00
Tamarupa
SULAWESI SELATAN

28% Pekerjaan Pabrik Es Portable dan DPT
* Pembuatan Pondasi Menerus Batu Bangunan Pabrik Es Portabel * Pemasangan Bekisting dinding penahan tanah * pembesian Dinding penahan tanah
2026-08-20 19:16:00
Pallameang
SULAWESI SELATAN

13% Pekerjaan DPT, Saluran dan Fabrikasi Pembesian
* Pek.Perakitan Besi Dpt * Pengecoran Dinding Penahan Tanah * Pek. Pemasangan Batu Bela Saluran dan Pemasangan Cerucuk Dolken * Fabrikasi Pembesian
2026-08-20 19:15:00
Takkalasi
SULAWESI SELATAN

22% Pemasangan Cerucut kayu dolken dan Fabrikasi Pembesian
* Pemasangan Cerucut kayu dolken DPT & Shelter Pendaratan Ikan * Fabrikasi Pembesian
2026-08-20 19:07:00
Takkalala
SULAWESI SELATAN

9% Persiapan Awal
* MC-0 bersama tim TA ,PPK dan Pengawas Konsultan * Pekerjaan pembesian footplate dan kolom
2026-08-20 19:02:00
Watolo
SULAWESI TENGGARA

2% Mobilisasi material
* Mobilisasi material
2026-08-20 17:05:00
Labone
SULAWESI TENGGARA

24% Pekerjaan DPT, Pondasi Tambatan, Revetmen
Pembesian DPT, Pembesian Tambatan, Galian Tanah Kaki DPT, Galian Pondasi Revetment, Galian Pondasi Tambatan, Batu Kososng Revetment, Cerucuk DPT, Cerucuk Tambatan, Pengecoran DPT.
2026-08-20 16:37:00
Terapung
SULAWESI TENGGARA

3% Pekerjaan DPT
* Galian DPT * Pemasangan Cerucuk Dolken
2026-08-20 13:39:00
Bungeng
SULAWESI SELATAN

2% Bouwplank dan Pengurugan Tanah
* Pemasangan Papan Bouwplank * Pengurugan Tanah
2026-08-20 11:24:00
Lero Pinrang
SULAWESI SELATAN

23% Pek Besi, Pengecoran dan Pembersihan
* Pek.Perakitan Besi * Pemasangan Besi Dpt dan Bekisting * Pengecoran Dinding Penahan Tanah, Pemasangan Pondasi Bangunan Pabrik Es Portable * Pek.Plesteran Dinding Bangunan Kios Perbekalan * Pek. Pengecoran Kolom Bangunan Kantor Pengelola * Fabrikasi Pembesian
2026-08-20 08:55:00
DETAIL SITE
Site Provinsi Status Completion Updated
SITE00139
Muara Tinobu
SULAWESI TENGGARA PENYANGGA 18% 2026-09-22 08:21:20 Lihat Site
SITE00064
Lampenai
SULAWESI SELATAN PENYANGGA 18% 2026-09-23 09:23:56 Lihat Site
SITE00138
Muara Sampara
SULAWESI TENGGARA PENYANGGA 18% 2026-09-15 09:49:46 Lihat Site
SITE00076
Boyantongo
SULAWESI TENGAH HUB 18% 2026-09-16 10:09:20 Lihat Site
SITE00014
Kupa
SULAWESI SELATAN PENYANGGA 17% 2026-09-24 10:20:34 Lihat Site
SITE00126
Tolinggula Pantai
GORONTALO HUB 17% 2026-09-23 17:25:00 Lihat Site
SITE00060
Harapan
SULAWESI SELATAN PENYANGGA 17% 2026-09-24 10:17:05 Lihat Site
SITE00049
Pasi-Pasi
SULAWESI SELATAN PENYANGGA 16% 2026-09-24 10:11:06 Lihat Site
SITE00012
Tubo Selatan
SULAWESI BARAT PENYANGGA 15% 2026-09-23 09:01:12 Lihat Site
SITE00022
Ponjalae
SULAWESI SELATAN PENYANGGA 15% 2026-09-24 09:47:28 Lihat Site