← Kembali ke Peta

DETAIL PROGRESS KNMP

90
Lokasi Progress Bergerak
18.11%
Progress Nasional
0.19%
Rata-rata per Site
0
Site Selesai 100%
TREND PROGRESS NASIONAL
TOP KENAIKAN PROGRESS
Takkalasi SULAWESI SELATAN
+50%
Mattiro Bombang SULAWESI SELATAN
+46%
Tamarupa SULAWESI SELATAN
+44%
Pajjukukang SULAWESI SELATAN
+43%
Borimasunggu SULAWESI SELATAN
+42%
Bassiang Timur SULAWESI SELATAN
+39%
Lasama SULAWESI TENGGARA
+39%
Latawe SULAWESI TENGGARA
+38%
Bone Pute SULAWESI SELATAN
+36%
Lero Pinrang SULAWESI SELATAN
+36%
Tadang Palie SULAWESI SELATAN
+33%
Karang-karangan SULAWESI SELATAN
+32%
Lakara SULAWESI TENGGARA
+32%
Tanjung Laimeo SULAWESI TENGGARA
+31%
Tondasi SULAWESI TENGGARA
+31%
RANKING PROVINSI
Provinsi Total Site Avg Completion Hub Penyangga
SULAWESI TENGGARA 15 23.73% 4 11
SULAWESI SELATAN 50 20.26% 7 43
SULAWESI BARAT 6 15.83% 0 6
SULAWESI TENGAH 14 15.36% 2 12
GORONTALO 11 5.45% 1 10
TOP 10 PROVINSI
ProvinsiAvg Completion
SULAWESI TENGGARA 23.73%
SULAWESI SELATAN 20.26%
SULAWESI BARAT 15.83%
SULAWESI TENGAH 15.36%
GORONTALO 5.45%
DISTRIBUSI PROGRESS NASIONAL
0%
11
1-25%
58
26-50%
27
51-75%
0
76-99%
0
100%
0
PROGRESS TERBARU
Lasama
SULAWESI TENGGARA

39% Pekerjaan DPT, Tambatan Perahu dan Pabrik Es Portable

2026-09-21 17:07:00
Tondasi
SULAWESI TENGGARA

31% Pekerjaan DPT, Tambatan Perahu dan Pabrik Es Portable

2026-09-21 17:06:00
Watolo
SULAWESI TENGGARA

22% Pekerjaan Pondasi
Pemasangan pondasi cakar ayam
2026-09-21 16:29:00
Bonde Utara
SULAWESI BARAT

22% Pekerjaan DPT
•pek.pemasangan bowplank untuk DPT
2026-09-21 15:34:00
Limbua
SULAWESI BARAT

20% Pekerjaan Saluran
pek.pasangan batu saluran
2026-09-21 15:32:00
Terapung
SULAWESI TENGGARA

28% Pekerjaan DPT
* Pekerjaan Pengecoran DPT
2026-09-21 10:13:00
Watolo
SULAWESI TENGGARA

22% Pekerjaan Pengecoran Footplate
* Pekerjaan Pengecoran Footplate
2026-09-20 20:10:00
Data
SULAWESI SELATAN

19% Pekerjaan Tambatan Perahu, DPT dan Pembesian
* Pek. Tambatan perahu pengecoran kolom precast * Pek. Pengecoran tapak dinding penahan tanah revetment * Fabrikasi Pembesian
2026-09-19 20:00:00
Pallameang
SULAWESI SELATAN

25% Pekerjaan Pabrik Es dan DPT
* Pek. Pembesian sloof pada bangunan pabrik es portable * Pek. Pembesian dinding penahan tanah
2026-09-19 19:53:00
Padang Kalua
SULAWESI SELATAN

22% Pekerjaan Pembesian
* Perakitan pembesian pondasi tapak
2026-09-19 19:45:00
DETAIL SITE
Site Provinsi Status Completion Updated
SITE00090
Bulete
SULAWESI SELATAN PENYANGGA 10% 2026-09-08 10:29:22 Lihat Site
SITE00044
Mabonta
SULAWESI SELATAN PENYANGGA 7% 2026-09-24 10:13:41 Lihat Site
SITE00045
Burau Pantai
SULAWESI SELATAN PENYANGGA 6% 2026-09-21 09:24:43 Lihat Site
SITE00087
Watang soreang
SULAWESI SELATAN PENYANGGA 5% 2026-09-23 10:34:08 Lihat Site
SITE00164
Pangalasiang
SULAWESI TENGAH PENYANGGA 4% 2026-09-23 10:21:43 Lihat Site
SITE00019
Pabiringa
SULAWESI SELATAN HUB 4% 2026-08-28 10:49:51 Lihat Site
SITE00052
Torokeku
SULAWESI TENGGARA HUB 3% 2026-09-24 10:05:36 Lihat Site
SITE00152
Darubiah
SULAWESI SELATAN PENYANGGA 3% 2026-09-14 09:57:47 Lihat Site
SITE00150
Siddo
SULAWESI SELATAN PENYANGGA 2% 2026-09-24 09:15:18 Lihat Site
SITE00018
Bungeng
SULAWESI SELATAN PENYANGGA 2% 2026-08-28 11:27:20 Lihat Site