DETAIL PROGRESS KNMP

100
Lokasi Progress Bergerak
41.55%
Progress Nasional
0.37%
Rata-rata per Site
0
Site Selesai 100%
TREND PROGRESS NASIONAL
TOP KENAIKAN PROGRESS
Mattiro Bombang SULAWESI SELATAN
+79%
Lero Pinrang SULAWESI SELATAN
+75%
Limbua SULAWESI BARAT
+70%
Punagaya SULAWESI SELATAN
+69%
Tadang Palie SULAWESI SELATAN
+69%
Tamarupa SULAWESI SELATAN
+67%
Terapung SULAWESI TENGGARA
+68%
Lumpue SULAWESI SELATAN
+66%
Bontorannu SULAWESI SELATAN
+65%
Watolo SULAWESI TENGGARA
+65%
Takkalasi SULAWESI SELATAN
+65%
Data SULAWESI SELATAN
+70%
Arungkeke Pallantikang SULAWESI SELATAN
+64%
Bungeng SULAWESI SELATAN
+63%
Lasama SULAWESI TENGGARA
+63%
RANKING PROVINSI
Provinsi Total Site Avg Completion Hub Penyangga
SULAWESI TENGGARA 15 52.33% 4 11
SULAWESI SELATAN 50 50.54% 7 43
SULAWESI BARAT 6 45.33% 0 6
SULAWESI TENGAH 14 44.50% 2 12
GORONTALO 11 36.09% 1 10
SULAWESI UTARA 15 0.53% 3 12
TOP 10 PROVINSI
ProvinsiAvg Completion
SULAWESI TENGGARA 52.33%
SULAWESI SELATAN 50.54%
SULAWESI BARAT 45.33%
SULAWESI TENGAH 44.50%
GORONTALO 36.09%
SULAWESI UTARA 0.53%
DISTRIBUSI PROGRESS NASIONAL
0%
11
1-25%
12
26-50%
42
51-75%
45
76-99%
1
100%
0
PROGRESS TERBARU
Letta
SULAWESI SELATAN

5% Leveling Lahan
Leveling Lahan
2026-08-13 12:43:00
Darubiah
SULAWESI SELATAN

3% Leveling Lahan
Leveling Lahan
2026-08-13 12:41:00
Dwitiro
SULAWESI SELATAN

7% Leveling Lahan
Leveling Lahan
2026-08-13 12:41:00
Bangko
SULAWESI TENGGARA

1% Pengukuran Bouwplank

2026-08-13 10:58:00
Cimpu Utara
SULAWESI SELATAN

3% Persiapan Akses Jalan

2026-08-12 17:32:00
Lero Pinrang
SULAWESI SELATAN

21% Persiapan Pembangunan Gudang Beku Portable, Docking Kapal dan DPT
* Pek. Pemasangan Besi dan Bekisting Sloof Gudang Beku Portable, Pemasangan Pondasi Batu Kali Bangunan Docking Kapal. * Pek. Pasangan Bata Merah dan Pengecoran Kolom Beton Bangunan Kios Perbekalan. * Pek.Pemasangan Cerucuk Dolken Dinding Penahan Tanah, Pengecoran Dpt dan Pondasi Footplate * Fabrikasi Pembesian
2026-08-12 17:24:00
Lumpue
SULAWESI SELATAN

3% Levelling Tanah Lokasi
Penimbunan tanah area lokasi dan pembuatan pondok di reksi
2026-08-12 17:22:00
Mattiro Bombang
SULAWESI SELATAN

28% Pembangunan Pabrik es Portabel & DPT
* Fabrikasi Pembesian Dinding penahan Tanah * Pemasangan Bekisting Dinding penahan Tanah * Tanah Urug Bangunan Pabrik es Portabel * Pengecoran kolom bangunan Kios Perbekalan
2026-08-12 17:19:00
Tirowali
SULAWESI SELATAN

18% Pek. Pemasangan Pondasi
* Pek. Pengecoran * Langsir Pasir dan batu Split * Pek. Cerucuk Kayu Dolken
2026-08-12 17:17:00
Boyantongo
SULAWESI TENGAH

2% Pengurugan Tanah Pesisir

2026-08-12 16:46:00
DETAIL SITE
Site Provinsi Status Completion Updated
SITE00189
Kalongan Selatan
SULAWESI UTARA PENYANGGA 0% Lihat Site